Skip to content

Automatic translation — the Portuguese version is the reference. View in Portuguese

Updated on 2026-10-05

Follow a send and roll back

The timeline of each send, approve or reject, and return Production to its previous state.

On this page (3)

Each send has a page (ETL/ELT → CI/CD, click the number). It shows what goes to Production, each stage with what happened in it, who decided and the link to the change request in the repository, when there is one.

Approve or reject#

If you can approve, the page shows Approve and send and Reject, with a comment field. A send with a destructive change asks for confirmation before approving.

If you cannot, the page says why — for example, "You requested this send — someone else needs to approve it."

Roll back#

After deployment, Roll back returns Production to the state before the send:

  • objects the send created are removed;
  • objects it changed go back to their previous version and are published again (the version moves forward, like a revert);
  • with the repository connected, the Production branch receives the restored state.

If there was a send after this one, roll back the most recent first.

Cancel#

While a send has not been deployed, Cancel send ends it without touching Production. Only one send can be in progress at a time.

Related links